Quick Summary
A building warrant application in Scotland usually needs structural drawings whenever the project changes the structure, such as removing a wall or building an extension. Expect floor plans showing structural elements, sections and elevations showing beam and lintel positions, and foundation details.
- Structural drawings are usually needed when removing a wall, opening a load-bearing wall or building an extension.
- Include floor plans, sections and elevations, and foundation details with the application.
- Confirm the scope of the structural work before preparing any drawings.
- Check that architectural and structural drawings agree before you submit.
- Gather structural calculations and the design certificate, which prove the design works.
Table of Contents
- Which Structural Drawings a Building Warrant Application Needs
- Step-by-Step: Preparing Your Building Warrant Application Drawings Checklist
- Structural Calculations for Building Warrant and Drawing Requirements for Extensions
- Frequently Asked Questions
Getting a building warrant in Scotland often stalls on one thing: the drawings. Architectural Services Scotland works on house extensions, garage conversions and wall removals across Fife, Edinburgh and the Lothians. Knowing what to submit before you apply saves time and avoids a request for more information. Clear structural drawings help prevent delays, and applying the same care to permit application documentation best practices keeps the rest of the submission consistent.
Which Structural Drawings a Building Warrant Application Needs
Structural drawings show how the new work will carry its loads. A building warrant application usually needs them whenever the project changes the structure, such as removing a wall, opening up a load-bearing wall or building an extension (Do I need a building warrant?).
For most projects, expect to provide:
- Floor plans showing the structural elements
- Sections and elevations showing beam and lintel positions
- Foundation details
If you plan to remove a load-bearing wall, you can read more in our structural wall removal guide. For that work, a load bearing wall removal service can produce the drawings directly.
Step-by-Step: Preparing Your Building Warrant Application Drawings Checklist
Work through these steps in order:
- Confirm the scope of the structural work.
- Prepare site, block and location plans at the right scale.
- Produce structural drawings showing beams, lintels and foundations.
- Check that the architectural and structural drawings agree.
- Gather supporting calculations and the design certificate.
A common mistake is sending architectural plans that do not match the structural details. Check the two sets against each other before you submit.
The checklist below sets out the main stages of preparing drawings, using the steps described in the article.
| Step | What to do | Note |
|---|---|---|
| 1 | Confirm the scope of the structural work | Do this first |
| 2 | Prepare site, block and location plans | At the right scale |
| 3 | Produce structural drawings | Show beams, lintels and foundations |
| 4 | Check architectural and structural drawings agree | Compare the two sets before submitting |
| 5 | Gather supporting calculations and design certificate | Include with the application |
Structural Calculations for Building Warrant and Drawing Requirements for Extensions
Structural calculations prove that the design works. Extensions usually need calculations for new beams, foundations and any altered load paths. Listed buildings can add further checks, and you can read about those in our guide on listed buildings and structural engineering approval. Many homeowners also ask whether an architect or structural engineer should produce the drawings, and our comparison of architect and structural engineer roles for extensions explains the difference.
Ask your designer early which calculations the local authority will expect, so they are included from the start.
Get your drawings right first time. Book a Feasibility Study with Architectural Services Scotland to get structural drawings and calculations prepared by one integrated team.
Frequently Asked Questions
What structural drawings are needed for a building warrant application?
A building warrant application in Scotland usually needs structural drawings that show the load-bearing elements of the proposed work, such as foundations, beams, lintels, posts and roof structure, with sizes and levels marked. Drawings should be read alongside the architectural plans, site plan and block plan so that the two sets agree. Where the design relies on calculations, the supporting structural information and the SER Design Certificate should be submitted with them. Checking your local authority’s current submission requirements before you apply will help avoid a request for further information.
Do I need structural calculations with my building warrant application?
Structural calculations are normally needed where the proposed work involves structural elements that must be shown to meet the Building (Scotland) Regulations, such as new openings in load-bearing walls, steel beams or extended roof structures. The calculations demonstrate that the design is structurally sound and support the drawings. For a simple extension with standard timber joists and lintels, the detail may be shown on drawings alone. Your structural engineer can confirm what your project requires before you submit.
Who can prepare structural drawings for a building warrant?
Structural drawings are usually prepared by a suitably qualified structural engineer, who takes responsibility for the structural design. Architectural Services Scotland combines architectural design and structural engineering in one firm, so the architectural plans and structural drawings can be coordinated from the start. Whoever prepares the drawings, the design responsibility and certification should be clear before the application is submitted.